Completed Projects
Mooring dolphins at berth 98 El Dekheila port
Mooring dolphins at berth 98 El Dekheila port The extension of berth 98 at the El-Dekheila port quay wall by 50 meters with the construction of two mooring dolphins. Through Installation of 18 steel pipe piles filled with reinforced concrete, as well as the...
Construction Marine Berth at Borolos Harbor
Construction Marine Berth at Borolos Harbor Construction of marine quay of 150 meters in length for the installation of heavy equipment for Borolos Power Plant,including 6000 square meters reinforced concrete back yard, storage yard with concrete flooring tiles...
Protection of the West Nile River Estuary Rashid Branch
Protection of the West Nile River Estuary Rashid Branch Construction of sand bridge to protect low-lying area from immersion at 200 m from shoreline with sections that consists of dolomite stone revetment, cement mixture and crushed stone layer with a base of...
Canal Rehabilitation and Lining Project
Canal Rehabilitation and Lining Project The objective of this project is to rehabilitate and upgrade 60 kilometers of canals in Kafr El Sheikh through the application of a dry stone coating of 30 cm thickness to the bed, slopes, and top toes. The rehabilitation...
Shore protection project for East Kitchener Area
Shore protection project for East Kitchener Area Construction of 13 groins of lengths varying from 90 to 130 meters using a combination of dolomite stones of varying weights, a 2-ton armor layer of tetrapods, and a foundation of geotextile mats, with sand nourishment...
Shore Protection Works For Villas Island Project of New Alamin
Shore Protection Works For Villas Island Project of New Alamin The aim of the project is to construct 4 Mazarine Islands for the development of Alamin's city through the dredging andexcavation of 475,000 cubic meters of a waterway. In order to ensure stability,...
The protection and the rehabilitation in front of Tabyet El-Abed
The protection and the rehabilitation in front of Tabyet El-Abed Construction of shore protection in front of Tabyet El-Abedat Rasheed â•fi El-Behera city.Along with Strengthen the seawall with buffers by usingtetrapod blocks with weight 6 and 12 ton and replacing...
The Protection of Region Eastern
The Protection of Region Eastern Constructing a 300m seawall of gradient weights dolomite stones andY shaped groins of a 250m length for the body and 100m for each wing.Along with executing sand nourishment for 1200 m of the shore lineand another seawall 700m in...
The repairing of the ELNG Breakwater
The repairing of the ELNG Breakwater Strengthen Breakwater toe and body by using 26 ton ofCore-loc and repairing the damage footing using (10-250)Kgs of the dolomite stones by using the marine equipment.The owner: ELNGProject designer: COWIThe supervisors Engineers:...
Construction of special Armed Forces harbor
Construction of special Armed Forces harbor Construction of a special armed forces harbor featuring a521 meter main breakwater and a 174 meter secondarybreakwater. The project included the execution of two newsheet pile quay walls, measuring 60 and 70 meters in...
Petrobel’s Shore Protection Project at Nidoco 6&11
Petrobel's Shore Protection Project at Nidoco 6&11 Construction of eight groins with average length from 75 to120m each, consisted of dolomite stones with variant gradients, Armor layer of Tetrapod 2 ton and foundation layers ofgeotextile mats.The owner: Belayim...