by ronza hani | Jun 2, 2024 | Completed Projects
Construction of special Armed Forces harbor Construction of a special armed forces harbor featuring a521 meter main breakwater and a 174 meter secondarybreakwater. The project included the execution of two newsheet pile quay walls, measuring 60 and 70 meters in...
by ronza hani | Jun 2, 2024 | Completed Projects
Petrobel’s Shore Protection Project at Nidoco 6&11 Construction of eight groins with average length from 75 to120m each, consisted of dolomite stones with variant gradients, Armor layer of Tetrapod 2 ton and foundation layers ofgeotextile mats.The owner:...
by ronza hani | Jun 2, 2024 | Completed Projects
Protecting El-Gameel Embouchure Construction of two groins, each with a length of 350meters, at the boundaries of the estuary. The projectinvolves several key components, including the supply andinstallation of geotextile mats and a gradient weights of dolomite stones...