by ronza hani | Jun 2, 2024 | Completed Projects
Shore protection project for East Kitchener Area Construction of 13 groins of lengths varying from 90 to 130 meters using a combination of dolomite stones of varying weights, a 2-ton armor layer of tetrapods, and a foundation of geotextile mats, with sand nourishment...
by ronza hani | Jun 2, 2024 | Completed Projects
Shore Protection Works For Villas Island Project of New Alamin The aim of the project is to construct 4 Mazarine Islands for the development of Alamin’s city through the dredging andexcavation of 475,000 cubic meters of a waterway. In order to ensure...
by ronza hani | Jun 2, 2024 | Completed Projects
The protection and the rehabilitation in front of Tabyet El-Abed Construction of shore protection in front of Tabyet El-Abedat Rasheed â•fi El-Behera city.Along with Strengthen the seawall with buffers by usingtetrapod blocks with weight 6 and 12 ton and replacing...
by ronza hani | Jun 2, 2024 | Completed Projects
The Protection of Region Eastern Constructing a 300m seawall of gradient weights dolomite stones andY shaped groins of a 250m length for the body and 100m for each wing.Along with executing sand nourishment for 1200 m of the shore lineand another seawall 700m in...
by ronza hani | Jun 2, 2024 | Completed Projects
The repairing of the ELNG Breakwater Strengthen Breakwater toe and body by using 26 ton ofCore-loc and repairing the damage footing using (10-250)Kgs of the dolomite stones by using the marine equipment.The owner: ELNGProject designer: COWIThe supervisors Engineers:...