one of our core values is Safety and Environment, we have fostered this culture from our inception to the present day, Conducting inspections and audits to find and eliminate unsafe working conditions and practices; and Hazard assessment identification 

Construction of Breakwaters 9&10 along breakwater NO.(8) from the west with a distance of 250 m, so that each breakwater length is 225 m with 250 between them which consists of different weights dolomite stones, armor layer of tetrapods 6 tons and a base of geotextile mats.

Protection Of East Damietta Harbor Area (Third Stage) (Construction Of Breakwaters 9&10) – Damietta

Government

  • Protection of East Damietta harbor area (Third stage) (construction of breakwaters 9&10) – Damietta Government

  • Protection of area East groins executed east el Gharbeya main drainage estuary (Kitchener) and sand nourishment at kafr El Sheikh Government.

  • Site works of Amer Field for the public petroleum company