The repairing of the ELNG Breakwater
Strengthen Breakwater toe and body by using 26 ton of
Core-loc and repairing the damage footing using (10-250)
Kgs of the dolomite stones by using the marine equipment.
The owner: ELNG
Project designer: COWI
The supervisors Engineers: The Engineering Center- Faculty of Engineering – Alexandria University.
The planned execution period: 18 months