Firstly: constructing sand embankments from the Geotube covered with insulator layer of sand and the Dolomite stones which weight (50-150) will be the main protection layer. Second: Constructing sand bumpers by using bamboo mats not less than 3m Length, 1m height, 1-inch thickness and supported 60 cm in the ground. Third: Constructing clay embankments from the Brolo's lake dredging output, covered by 1m thickness sand layer and protected by 3*3m Bamboo mats basins.